The final grading of the road is complete, and the electrical cables have been extended from the lower cul-de-sac to the upper cul-de-sac. The picture above, taken from the lower cul-de-sac, shows a pile of the kind of gravel that will be used to create a 6-inch base. Lot I is on the right; Lot 6 is on the left.